Changes

Jump to navigation Jump to search
Line 34: Line 34:  
|  
 
|  
 
*Recap of the previous months (Changes to the UML model since the last workshop, test data sets, etc.)
 
*Recap of the previous months (Changes to the UML model since the last workshop, test data sets, etc.)
*Operation and maintenance of subsurface infrastructure
+
*Discussion on the roadmap for releasing Utility Network ADE version 1.0: What to include, what to leave out for version 1.0
*Utility Network Interdependency Modelling
+
**Documention, use case examples, use case data, software support
*The IntegrCiTy project
+
**Status and plans for modelling of network-specific packages
 
|
 
|
 
*T. Kutzner (TUM)
 
*T. Kutzner (TUM)
*R. ter Huurne (UT) (tbc)
+
*All participants
*I. Boates (EIFER)
  −
*E. Widl (AIT) (tbc)
      
|- style="background-color:#e8e8e8;"
 
|- style="background-color:#e8e8e8;"
Line 49: Line 47:  
|- style="vertical-align:top; background-color:#bcd2ee;"
 
|- style="vertical-align:top; background-color:#bcd2ee;"
 
| 14:30-16:00
 
| 14:30-16:00
|
+
|
*Discussion on the roadmap for releasing Utility Network ADE version 1.0: What to include, what to leave out for version 1.0
+
Presentations
**Documention, use case examples, use case data, software support
+
*Operation and maintenance of subsurface infrastructure
**Status and plans for modelling of network-specific packages
+
*Utility Network Interdependency Modelling
| All participants
+
*The IntegrCiTy project
 +
|
 +
<br/>
 +
*R. ter Huurne (UT)
 +
*I. Boates (EIFER)
 +
*E. Widl (AIT)
    
|- style="background-color:#e8e8e8;"
 
|- style="background-color:#e8e8e8;"

Navigation menu